bc.game casino bc.game casino Building Investment Quote Company#2 The generator rotor to wear is successfully completed
Source: Hebei Construction Investment Group Time: 2023-04-07

4March 6th at 14:08,Building Investment Promotion Company#2 The generator rotor to wear once successfully,Another milestone node that marks the successful realization of the construction investment is successfully bc.game review 2024 realized,bc.game review 2024 Lay a solid foundation for the installation of#2 steam turbine in the next step.。

To ensure a successful dressing of the rotor,Electric majors of the Engineering Management Department are conjunction with manufacturers、Supervision、Construction units and other relevant professionals carefully plan,Constantly optimize the dressing bc.game casino plan,A bc.game casino comprehensive analysis of each safety risk point during the operation and formulating corresponding preventive measures,Detailed security technical intercourse on the operator。

During the rotor wear,On -site commanders are always paying attention to driving safety,and closely cooperate with the person who pulls the chain on both sides,bc.game live casino Strict bc.game casino control of wearing speed,Simultaneously arrange a person to monitor the distance between the rotor and the inner wall of the stator at the same time,Under the precise adjustment and close cooperation of various professional and technical personnel at the scene,#2 Unit generator Rotor rotor strict seams Fall into the stator bore。

Next,Building investment bc.game casino review bc.game app can continue all cadres and employees will continue to overcome difficulties、Practical and acting,Accelerate the progress of project construction with a strong sense of mission,Make sure that the dual machine is put into production on schedule。

                                       (Conferring in Lu Yiming, Jianjiang Power Company)