Xibaipo Power Generation Company No. 6 The electric load is deep to 180MW
Source: Hebei Construction Investment Group Time: 2023-04-18

To respond to the national call,According to the overall requirements of the "three reform work" of the construction investment energy,West Power Company carried out flexibility transformation during the "Fourteenth Five -Year Plan" period、Heating transformation and energy -saving transformation bc game sportsbook review bc.game review 2024 (hereinafter referred to as "three reforms") work,Carry out unit heating performance and contribution diagnostic test、Peak Test and Pure Concrete Work Condition Energy Consumption Test,April 12,Xibaipo Power Generation Co., Ltd.,Unit No. 6 The three -way change test takes the situation。

During the heating period,Leading the Equipment Management Department of West Power Company,Organization Power Generation Operation Department、Boiler workshop、Thermal control workshop,and invite the Institute of Science and Technology as a test responsible unit,At 40%rated load、Commonly used load、The maximum heating power work condition、85%of the rated load four industrial conditions for testing the maximum heating power bc.game app bc.game casino test at different loads,Paid No. 5、No. 6 unit heating capacity to find out,I got important test data,Determined the direction of technical transformation。

4Since the month,Unit No. 6 low load steady -burning test、Load changes test preparation work is in full swing。Early morning on the 12th,Relevant personnel of West Power Corporation came to the main control room of the three units,Carry out test work。Difficult points of this trial、range wide、Difficulty operation,Boiler Low load steady -burning power、Observation of the heating surface wall temperature、How to ensure the normal operation of the denitration system and the discharge of nitrogen oxides in the low load state and the nitrogen oxide emissions bc.game is not exceeded.。To ensure bc.game poker the safety of the test,Before the test,Master、Auxiliary machine link、Protecting normal operation,Stable runs for 6 hours at 300MW load,The normal operation of the coal mill and the fineness and contribution of the powder production and force meet the design requirements。At the same time,The thermal control workshop is closely paying attention to the furnace flame monitor and the flame detection device to run reliable,Make sure the flame in the furnace is clear and visible。Normal input of far -pass testing points、Instructions correct,fuel and steam for the furnace,Do a good job of preparing oil at any time,Investors in various oil guns are investigated,Ensure the normal investment of the burning equipment,bc.game poker To prevent the fire from the fire。

The crew will take the peak at the starting point with 300MW work.,The lower limit of the test is determined based on the results of the low load of the boiler low load (expected to be 180mW),Test in different coal types、Peak adjustment capabilities in different auxiliary machines,300MW at the same time、240MW and 180MW host and main auxiliary machine energy consumption test。After everything is ready,When the crew reaches 240MW,Waiting for the stability of various systems,Continue to reduce the load when you have the condition of continuing test,Forced by 3%of the boiler,Observe 20-30 minutes,After the number of parameters is stable,Reduce the contribution of the boiler until it reaches 200MW。During the bc.game casino bc.game casino review bc.game period,Experimental personnel closely monitor and control the export of soda separators、Three fans running status、Burn fire check、Nitrile entrance temperature、Parameters such as the temperature of the heating surface wall,Timely deal with problems when you find problems。

The entire experiment lasted for 6 hours,Unwilling oil、Under the condition of unpopular plasma burning,At 14:20 pm deep peak adjustment electricity load reached 183.4MW。Touched the energy consumption level of the unit under different loads,It can effectively improve the unit's Internet competitiveness and profitability,This is an important moment for the three reforms,It is also another historical moment of Western Power Company。This marks that West Power Company is bc.game casino bc.game casino review gradually aging in the face of unit equipment、The situation of environmental protection is becoming increasingly severe、Coal supply is becoming more and more tight under various unfavorable situations,Seek fine、Science、A big step in the process of efficient development。

                                       (Xibaipo Power Generation Company  Wang Chenge's supply)