The overhaul of the No. 1 generator of Zunhua Thermal Power Company and the rotor extraction bc.game live casino was successfully completed
Source: Hebei Construction Investment bc.game live casino Time: 2023-09-27

9Month 22nd,With the operation of the steam turbine plant, the "beep" sound is heard,The rotor of the No. 1 generator of Zunhua bc.game live casino was successfully extracted from the stator chamber of the generator。

In order to ensure the smooth progress of the A-level maintenance work of Unit 1,Zunhua Thermal Power held a special work mobilization meeting,Prepare for the No. 1 Unit Maintenance Competition,Invest all manpower with a highly responsible attitude,According to the company’s maintenance work goals,Stay safe、Ensure quality、Ensuring overall progress requirements,Control from the company、Overall coordination,Division of responsibilities to each department,The organization has implemented a series of careful supporting safeguard measures,Unified scheduling and coordination、Work items、Responsible for division of labor,bc.game live casino work together,Work hard for the normal A-level maintenance of Unit 1。From research on major unit maintenance projects to formulation of maintenance schedule,From equipment status analysis to maintenance plan preparation,Every link has been carefully arranged,Comprehensively prepare supplies、Safety Education、Implement the system and other work,Continuously improve and refine management,Promote standardized maintenance。

bc.game live casino of Zunhua Thermal Power are meticulous、Perform every step carefully,Ensure safety in every step、In time、in place、Operation is correct,Overcome many difficulties,Take multiple measures,Think big,Start small,Ensure the quality of equipment maintenance,Laying a solid foundation for safe and reliable heating this winter。

(Contributed by Li Fanghu of Zunhua bc.game live casino)